Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 556359.015
Citation: 01005B
Citation Type: Other
Abatement Date: 01/02/2013 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/19/2012
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0418200
Contest Date:
Final Order: 01/23/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/23/2013 | $0.00 | 01/02/2013 | Other | |
Penalty | Z: Issued | 12/19/2012 | $0.00 | 01/02/2013 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors a) At the cargo bin break room area- The employer ran an electrical cord through a hole in the ceiling to power a scrolling marquee; exposing employees to electrical hazards.