Violation Detail
Standard Cited: 19100252 A03 II General requirements.
Inspection Nr: 540479.015
Citation: 01003
Citation Type: Serious
Abatement Date: 03/01/2013 2
Initial Penalty: $2,800.00
Current Penalty: $2,800.00
Issuance Date: 01/24/2013
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0524530
Contest Date:
Final Order: 02/19/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/19/2013 | $2,800.00 | 03/01/2013 | Serious | |
| Penalty | Z: Issued | 01/24/2013 | $2,800.00 | 01/30/2013 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.252(a)(3)(ii): All hollow spaces, cavities, or containers were not vented to permit the escape of air or gases before preheating, cutting, or welding was performed: Employees conducting welding repair work to a 201 tank were exposed to flash fires and explosions, and the company did not required that the crew adequately vented the tank to permit the escape of air and gases before welding repairs were made on the tank.
Translate