Violation Detail
Standard Cited: 19100147 C01 The control of hazardous energy (lockout/tagout).
Inspection Nr: 539938.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/31/2012 2
Initial Penalty: $6,300.00
Current Penalty: $4,410.00
Issuance Date: 09/27/2012
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 10/23/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/23/2012 | $4,410.00 | 10/31/2012 | Serious | |
| Penalty | Z: Issued | 09/27/2012 | $6,300.00 | 10/12/2012 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(1): The employer did not establish a program consisting of an energy control procedure, employee training and periodic inspections to ensure that before any employee performed any servicing or maintenance on a machine or equipment where the unexpected energing, startup or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source and rendered inoperative: a) On or about July 16, 2012 and prior to this date, the employer had not established energy control procedures, trained employees, and provided periodic inspections, including to isolate the unexpected hot water energy releases during discharge and return hose changes on the boiler truck unit.
Translate