Violation Detail
Standard Cited: 19100184 E02 II Slings.
Inspection Nr: 532878.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 09/05/2012 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/14/2012
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0728900
Contest Date:
Final Order: 09/10/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 08/14/2012 | $0.00 | 09/05/2012 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.184(e)(2)(ii): Makeshift link(s) or fastener(s) attachment(s) were used to connect links or fastenings on alloy steel chain(s): In the vehicle dismantle area of the facility the employer is failing to ensure that chains on the hoist were not repaired with makeshift link(s).