Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 526998.015
Citation: 01004
Citation Type: Serious
Abatement Date: 12/04/2012 2
Initial Penalty: $4,208.00
Current Penalty: $1,680.00
Issuance Date: 11/02/2012
Nr Instances: 3
Nr Exposed: 80
Related Event Code (REC):
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 11/28/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/28/2012 | $1,680.00 | 12/04/2012 | Serious | |
| Penalty | Z: Issued | 11/02/2012 | $4,208.00 | 12/04/2012 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) Temporary wiring was being used as permanent for the RUPP TEMP-HEAT UNITS burners along the wall. ABATEMENT CERTIFCATION AND ABTEMENT DOCUMENTATION REQUIRED