Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 478942.015
Citation: 01001
Citation Type: Serious
Abatement Date: 12/16/2012 2
Initial Penalty: $5,000.00
Current Penalty: $3,500.00
Issuance Date: 11/13/2012
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): C
Gravity: 5
Report ID: 0521400
Contest Date:
Final Order: 12/11/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/11/2012 | $3,500.00 | 12/16/2012 | Serious | |
| Penalty | Z: Issued | 11/13/2012 | $5,000.00 | 12/16/2012 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: On or about June 20, 2012, energy control procedures were not uitlized to lockout the Assembly Room Lize 2 equipment when the filler hoses were being tied up to prevent spillage of gravy onto the floor. Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).