Violation Detail
Standard Cited: 19100333 B02 II B Selection and use of work practices
Inspection Nr: 473118.015
Citation: 01004
Citation Type: Serious
Abatement Date: 11/05/2012 2
Initial Penalty: $2,800.00
Current Penalty: $1,400.00
Issuance Date: 10/29/2012
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 11/16/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/16/2012 | $1,400.00 | 11/05/2012 | Serious | |
| Penalty | Z: Issued | 10/29/2012 | $2,800.00 | 11/05/2012 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.333(b)(2)(ii)(B): The circuits and equipment to be worked on were not disconnected from all electric energy sources: At the Southern most portion of the job site on June 15, 2012, the employer did not conduct lock out tag out procedures to the 480 volt electrical panel, exposing employees to electrical shock and arc flash hazards.