Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 448073.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 09/14/2012 5
Initial Penalty: $2,000.00
Current Penalty: $2,000.00
Issuance Date: 09/13/2012
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): I
Gravity: 5
Report ID: 0317000
Contest Date:
Final Order: 11/01/2012
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/13/2012 | $2,000.00 | 09/14/2012 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: a) Jobsite: 1824 Christian St, Philadelphia, PA. - On or about 5/29/12, the working platforms on the supported tubular welded frame scaffold were missing planks. Employees were performing masonry operations from the 3rd working platform, approximately 18 ft. above ground level.