Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 435892.015
Citation: 01005
Citation Type: Other
Abatement Date: 11/10/2012 2
Initial Penalty: $3,500.00
Current Penalty: $1,000.00
Issuance Date: 10/26/2012
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0626700
Contest Date:
Final Order: 11/07/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/07/2012 | $1,000.00 | 11/10/2012 | Other | |
| Penalty | Z: Issued | 10/26/2012 | $3,500.00 | 11/10/2012 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: At the site, in the electrical room next to the ring mill area, and in various departments throughout the facility, there are no specific procedures for inspecting and certifiying that all energy control lockout tagout procedures are being performed correctly, exposing workers to potential electrocution hazards.