Violation Detail
Standard Cited: 19100184 F05 VII Slings.
Inspection Nr: 408922.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/26/2012
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 11/21/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 10/26/2012 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
COKER SILO: 29 CFR 1910.184(f)(5)(vii): Wire rope sling(s) that had corrosion of the rope or end attachments were not immediately removed from service: COKER SILO: On or about May 1, 2012, the employer did not ensure that wire rope slings used to suspend a coker chute were removed from service when damaged or defective. The wire rope slings showed indications of corrosion. This condition exposed employees to potential fall and/or struck by hazards.