Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 403622.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/30/2012 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 10/01/2012
Nr Instances: 1
Nr Exposed: 16
Related Event Code (REC): A
Gravity: 10
Report ID: 0728900
Contest Date:
Final Order: 10/24/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 10/01/2012 | $7,000.00 | 10/30/2012 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: Rail Car Testing Facility, 6600 NW 27th Street, Lincoln, NE: Procedures were not developed to protect employees from unexpected energization, start up, or release of stored energy. Specifically, a procedure for locking out the Direct Current Stingers used to energize railcars was not developed as required under this standard. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citations.