Violation Detail
Standard Cited: 19100269 O02 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 385603.015
Citation: 01005
Citation Type: Serious
Abatement Date: 09/28/2012 2
Initial Penalty: $4,900.00
Current Penalty: $3,625.00
Issuance Date: 09/27/2012
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 10/23/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/23/2012 | $3,625.00 | 09/28/2012 | Serious | |
| Penalty | Z: Issued | 09/27/2012 | $4,900.00 | 09/28/2012 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.269(o)(2)(i): The employer did not establish and enforce work practices for the protection of each worker from the hazards of high-voltage or high-power testing at all test areas, temporary and permanent: On or about April 3, 2012, at a remote overhead powerline re-routing site, the employer did not test an overhead power line for residual currents as it was lowered to an employee on the ground, exposing an employee to the hazard of electricity.