Violation Detail
Standard Cited: 19100132 D01 General requirements.
Inspection Nr: 385603.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 09/28/2012 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/27/2012
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 1
Report ID: 0627700
Contest Date:
Final Order: 10/23/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/23/2012 | $0.00 | 09/28/2012 | Serious | |
| Penalty | Z: Issued | 09/27/2012 | $0.00 | 09/28/2012 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.132(d)(1): The employer did not assess the workplace to determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE): On or about April 3, 2012, at a remote overhead powerline re-routing site, the employer failed to conduct a work site assessment to ensure overhead powerlines were de-energized prior to allowing employees to work on the lines, exposing employees to the hazard of electricity.
Translate