Violation Detail
Standard Cited: 19100147 C07 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 315145953
Citation: 02006
Citation Type: Willful
Abatement Date: 10/10/2012 X
Initial Penalty: $70,000.00
Current Penalty: $55,236.00
Issuance Date: 06/12/2012
Nr Instances: 2
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0111400
Contest Date: 07/03/2012
Final Order: 09/20/2012
Emphasis: X
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/20/2012 | $55,236.00 | 10/10/2012 | Willful | |
Penalty | Z: Issued | 06/12/2012 | $70,000.00 | 07/27/2012 | Willful |