Violation Detail
Standard Cited: 19100303 B01 General.
Inspection Nr: 314060807
Citation: 01007
Citation Type: Other
Abatement Date: 07/12/2011 I
Initial Penalty: $4,000.00
Current Penalty: $1,000.00
Issuance Date: 07/07/2011
Nr Instances: 2
Nr Exposed: 1
Related Event Code (REC):
Gravity: 05
Report ID: 0728900
Contest Date: 07/17/2011
Final Order: 01/28/2013
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/28/2013 | $1,000.00 | 07/12/2011 | Other | |
| Penalty | Z: Issued | 07/07/2011 | $4,000.00 | 07/12/2011 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard: CHEMNEP
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees: Panel Room 4: There were two installations that had covers installed that were not secured using all of the fitting provided by the manufacturer of the device. In both installations, there are obvious marks where the fixture had been secured using the adequate number of fittings (screws or nuts). a) A circuit breaker panel was being secured using a single screw where there are to be four (one at each corner). The screw that was in place was undersized and the cover could potentially be pulled over the screw. b) A cable tray at the rear of the room had a cover being held in place by a single nut over a stud. The cover had multiple openings in which to secure the cover but were left unused. This allowed the cover to be moved and expose the live parts within. These items were corrected during the inspeciton. No additional documentation is necessary.