Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 311525349
Citation: 01001A
Citation Type: Serious
Abatement Date: 12/16/2008 X
Initial Penalty: $1,875.00
Current Penalty: $1,875.00
Issuance Date: 12/04/2008
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC): A
Gravity: 03
Report ID: 0625700
Contest Date: 01/09/2009
Final Order: 03/11/2009
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 03/11/2009 | $1,875.00 | 12/16/2008 | Serious | |
| Penalty | Z: Issued | 12/04/2008 | $1,875.00 | 12/16/2008 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard: REFINERY
29 CFR 1910.147(d)(3): All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): Vacuum Pipe Still 2 (VPS-2). The employer did not ensure that the energy isolation device (TV139 with associated valves & piping) in the High Pressure Boiler Feed Water Line was closed to prevent backflow/leakage of high pressure water into the 600 psi steam line between 83H101 (Charge Tower) and the 83D101 (Steam Desuperheater). This exposed employees to the sudden and un-expected release of steam and/or hot water at approx 240 deg F.