Violation Detail
Standard Cited: 19100036 B01 Design and construction requirements for exit routes.
Inspection Nr: 309061018
Citation: 01001A
Citation Type: Serious
Abatement Date: 02/28/2006 X
Initial Penalty: $2,250.00
Current Penalty: $2,250.00
Issuance Date: 02/01/2006
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 03
Report ID: 0551800
Contest Date:
Final Order:
Emphasis:
Translate