Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 306195199
Citation: 01002A
Citation Type: Serious
Abatement Date: 01/13/2010 X
Initial Penalty: $5,000.00
Current Penalty: $5,000.00
Issuance Date: 11/24/2009
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 10
Report ID: 0215300
Contest Date: 12/16/2009
Final Order: 12/23/2010
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 12/23/2010 | $5,000.00 | 01/13/2010 | Serious | |
| Penalty | Z: Issued | 11/24/2009 | $5,000.00 | 01/13/2010 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard: REFINERY
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a.Unit #2 - Waste Heat Boiler (WHB) Platform: On or about 6/4/09, the employer did not develop, document and utilize LOTO procedures to isolate the WHB Blow Down Drum from hazardous energy sources (upstream boiler). NOTE:Certification and documentation of abatement must be submitted for this citation item as required by 29 CFR 1903.19(c) and (d), respectively.
Translate