Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 304672330
Citation: 01001
Citation Type: Repeat
Abatement Date: 08/10/2001 X
Initial Penalty: $9,000.00
Current Penalty: $9,000.00
Issuance Date: 10/17/2001
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 1055350
Contest Date:
Final Order:
Emphasis: