Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 280715.015
Citation: 01002
Citation Type: Serious
Abatement Date: 09/26/2012 2
Initial Penalty: $4,200.00
Current Penalty: $2,500.00
Issuance Date: 09/05/2012
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0213600
Contest Date:
Final Order: 09/28/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/28/2012 | $2,500.00 | 09/26/2012 | Serious | |
| Penalty | Z: Issued | 09/05/2012 | $4,200.00 | 09/26/2012 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) On or about 3/14/12 at 120 Earhart Drive, Williamsville, NY; where employees were working on "live" electrical parts (277 volts AC) while retrofitting fluorescent lighting fixtures with new, energy efficient ballasts. ABATEMENT CERTIFICATION REQUIRED
Translate