Violation Detail
Standard Cited: 19260753 D02 III Hoisting and rigging.
Inspection Nr: 242644.015
Citation: 01008
Citation Type: Serious
Abatement Date: 08/22/2012 2
Initial Penalty: $4,200.00
Current Penalty: $2,184.00
Issuance Date: 08/21/2012
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0625400
Contest Date:
Final Order: 11/02/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/02/2012 | $2,184.00 | 08/22/2012 | Serious | |
| Penalty | Z: Issued | 08/21/2012 | $4,200.00 | 08/22/2012 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1926.753(d)(2)(iii): All loads were not rigged by a qualified rigger. On or about February 23, 2012, and at times prior thereto, employees were rigging a spreader bar to the tines of a JCB telescopic handler with chokers to lift and install the roof trusses on the new Sealy Police Department building without the employer ensuring they were qualified, exposing employees to the hazard of being struck by the loads and/or materials. Pursuant to 29 C.F.R. 1903.19, within ten (10) calendar days of the date of this citation, the employer must submit documentation showing that it is in compliance with the standard, including describing the steps that it is taking to ensure that all loads will be rigged by a qualified rigger.