Violation Detail
Standard Cited: 19260404 F06 Wiring design and protection.
Inspection Nr: 190088.015
Citation: 02001
Citation Type: Other
Abatement Date: 06/06/2012 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/15/2012
Nr Instances: 5
Nr Exposed: 5
Related Event Code (REC):
Gravity:
Report ID: 0215800
Contest Date: 06/11/2012
Final Order: 12/17/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 12/17/2012 | $0.00 | 06/06/2012 | Other | |
| Penalty | C: Contested | 06/15/2012 | $0.00 | 06/06/2012 | Other | |
| Penalty | Z: Issued | 05/15/2012 | $0.00 | 06/06/2012 | Other |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.404(f)(6): The path to ground from circuits, equipment, or enclosures was not permanent and continuous: a) On or about 1/25/2012, At the job site ground floor: There were two metal cased lights that were not provided with paths to ground. b) On or about 1/25/2012, At the job site ninth floor: There was one metal cased light, a temporary power tap, and one Milwaukee Sawz all that was not provided with a path to ground. Abatement certification is required for this item.