Violation Detail
Standard Cited: 19260403 B01 General requirements.
Inspection Nr: 190088.015
Citation: 01006A
Citation Type: Serious
Abatement Date: 06/06/2012 2
Initial Penalty: $2,400.00
Current Penalty: $979.00
Issuance Date: 05/15/2012
Nr Instances:
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0215800
Contest Date: 06/11/2012
Final Order: 12/17/2012
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 12/17/2012 | $979.00 | 06/06/2012 | Serious | |
| Penalty | C: Contested | 06/15/2012 | $2,400.00 | 06/06/2012 | Serious | |
| Penalty | Z: Issued | 05/15/2012 | $2,400.00 | 06/06/2012 | Serious |
Text For Citation: 01 Item/Group: 006A Hazard:
29 CFR 1926.403(b)(1): Employer did not ensure that electrical equipment is free from recognized hazards that are likely to cause death or serious physical harm to employees: a) On or about 1/25/2012, At the job site 9th floor: A Milwaukee Sawz All had a damaged cord with a copper conductor exposed. Abatement certification is required for this item.
Translate