Violation Detail
Standard Cited: 19261153 G01 I
Inspection Nr: 1731471.015
Citation: 01006
Citation Type: Serious
Abatement Date: 08/09/2024
Initial Penalty: $8,067.00
Current Penalty: $8,067.00
Issuance Date: 07/16/2024
Nr Instances: 1
Nr Exposed: 12
Related Event Code (REC):
Gravity: 5
Report ID: 0213900
Contest Date: 08/06/2024
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 09/09/2024 | $8,067.00 | 08/09/2024 | Serious | |
Penalty | Z: Issued | 07/16/2024 | $8,067.00 | 08/09/2024 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.1153(g)(1)(i): The exposure control plan did not contain a description of the tasks in the workplace that involved exposure to respirable crystalline silica: a) Pinewald Aqua water tower: The exposure control plan did not include the use of Perma Clean 100 Epoxy Part A paint product code A-4165 that contained 5-10% microcrystalline silica and was used to spray paint the interior and exterior of the 1.5 million gallon Pinewald water tower, on or about 1/17/24. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.