Violation Detail
Standard Cited: 19260652 C02 I Requirements for protective systems.
Inspection Nr: 1690080.015
Citation: 02001
Citation Type: Willful
Abatement Date: 3
Initial Penalty: $161,323.00
Current Penalty: $112,926.10
Issuance Date: 02/08/2024
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0418100
Contest Date: 03/05/2024
Final Order: 12/20/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/20/2024 | $112,926.10 | Willful | ||
Penalty | C: Contested | 03/05/2024 | $161,323.00 | Willful | ||
Penalty | Z: Issued | 02/08/2024 | $161,323.00 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.652(c)(2)(i): Design of support systems, shield systems, or other protective systems that are drawn from manufacturer's tabulated data were not in accordance with all specifications, recommendations, and limitations issued or made by the manufacturer: a) Excavation located on Massee Ln.: On or before August 10, 2023, the employer deviated from the specifications, recommendations, and limitations determined by the manufacturer of the shoring used to protect employees performing sewer line installation while working inside a 21-feet deep trench excavation and did not request written approval from the manufacturer exposing employees to engulfment and struck by hazards.