Violation Detail
Standard Cited: 19100124 J02 I
Inspection Nr: 1689764.015
Citation: 01004
Citation Type: Other
Abatement Date: 3
Initial Penalty: $6,026.00
Current Penalty: $0.00
Issuance Date: 11/09/2023
Nr Instances: 1
Nr Exposed: 100
Related Event Code (REC):
Gravity: 1
Report ID: 0215800
Contest Date: 12/04/2023
Final Order: 03/08/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/08/2024 | $0.00 | Other | ||
Penalty | C: Contested | 12/04/2023 | $6,026.00 | Serious | ||
Penalty | Z: Issued | 11/09/2023 | $6,026.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.124(j)(2)(i): The employer did not ensure airflow was adequate at least quarterly during operation: a) Ventilation for Plating Lines, Anoplate Corporation, 459 Pulaski Street, Syracuse NY, 13204, on or about 8/9/2023: Ventilation on dipping and coating lines were not checked on at least a quarterly basis to ensure airflow was adequate.