Standard Cited: 19100269 C01 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1684216.015
Citation: 01004B
Citation Type: Serious
Abatement Date: 02/05/2024 2
Initial Penalty: $0.00
Current Penalty: $4,500.00
Issuance Date: 01/09/2024
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0830600
Contest Date:
Final Order: 02/02/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/02/2024 | $4,500.00 | 02/05/2024 | Serious | |
Penalty | Z: Issued | 01/09/2024 | $0.00 | 02/05/2024 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.269(c)(1)(ii): The employer did not ensure that the employee in charge conducts a job briefing that meets paragraphs (c)(2), (c)(3), and (c)(4) of this section with the employees involved before they start each job: a) On or about July 13, 2023, and at times prior, LND Technical Services, LLC, did not provide, at any point before or during work, a Substation 2-specific, pre-job briefing for employees that addressed the following items related to the scope of work: (1) hazards associated with the job; (2) work procedures involved; (3) special precautions; (4) energy-source controls; and (5) requirement for personal protective equipment. This exposed employees to electrical hazards.