Violation Detail
Standard Cited: 19100145 E02 Specifications for accident prevention signs and tags.
Inspection Nr: 1653918.015
Citation: 02001
Citation Type: Other
Abatement Date: 06/06/2023 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/10/2023
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 1
Report ID: 0336000
Contest Date:
Final Order: 06/13/2023
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/13/2023 | $0.00 | 06/06/2023 | Other | |
| Penalty | Z: Issued | 05/10/2023 | $0.00 | 06/06/2023 | Serious |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.145(e)(2): The wording of signs was not easily read and concise. a.) Wabtec Freight Rail, Inc, Roof of Building 5, on or about 2/14/23, and times prior thereto: A label attached to the ladder was not legible due to the message being worn off, The label was associated with the Werner 6' Type 1A A Frame Ladder. ABATEMENT CERTIFICATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation (see below). This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement.
Translate