Violation Detail
Standard Cited: 19100107 B02 Spray finishing using flammable and combustible materials.
Inspection Nr: 1653602.015
Citation: 01002A
Citation Type: Serious
Abatement Date: 08/15/2023 2
Initial Penalty: $5,358.00
Current Penalty: $3,215.00
Issuance Date: 06/20/2023
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 1032500
Contest Date:
Final Order: 07/13/2023
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/13/2023 | $3,215.00 | 08/15/2023 | Serious | |
| Penalty | Z: Issued | 06/20/2023 | $5,358.00 | 07/17/2023 | Serious |
Text For Citation: 01 Item/Group: 002A Hazard:
29 CFR 1910.107(b)(2): The interior surface of spray booth(s) were not smooth and continuous without edges and otherwise designed to prevent pocketing of residues and to facilitate cleaning and washing without injury: (a) On or about February 2, 2023 and at times prior thereto; the walls of the paint room had open spaces where paint and residue had collected. Abatement Note: Abatement certification required for this item. See enclosed "Certification of Corrective Action Worksheet."
Translate