Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1653596.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 08/11/2023 5
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/18/2023
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0316400
Contest Date:
Final Order: 08/14/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 07/18/2023 | $0.00 | 08/11/2023 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. a) Lippman- Milwaukee 51x65 LS Crusher Plant. On or about February 28, 2023, and times prior employees were performing maintenance on the Lippman-Milwaukee impact crusher. Procedures were not developed and documented, exposing employees to potentially hazardous gravitational energy.