Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1648080.015
Citation: 01002
Citation Type: Serious
Abatement Date: 07/27/2023 2
Initial Penalty: $2,679.00
Current Penalty: $1,607.40
Issuance Date: 06/30/2023
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): C
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 07/12/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/12/2023 | $1,607.40 | 07/27/2023 | Serious | |
Penalty | Z: Issued | 06/30/2023 | $2,679.00 | 07/27/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) Throughout the warehouse - On or about February 2, 2023, and at times prior, the employer exposed employees to fire hazards in that, the employer failed to ensure employees were able to open the exit route doors from the inside at all times without keys and tools when the doors were locked with no access to the keys for employees while they were working inside the warehouse and/or operating powered industrial trucks.