Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1643576.015
Citation: 01011
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $15,625.00
Current Penalty: $12,625.00
Issuance Date: 06/08/2023
Nr Instances: 1
Nr Exposed: 7
Related Event Code (REC): A
Gravity: 10
Report ID: 0521700
Contest Date:
Final Order: 07/05/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/05/2023 | $12,625.00 | Serious | ||
Penalty | Z: Issued | 06/08/2023 | $15,625.00 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations. a. Between December 22, 2022, and January 12, 2023, the employer did not ensure an engineering survey was performed by a competent person to determine the conditions of the walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations.