Violation Detail
Standard Cited: 19260025 A Housekeeping.
Inspection Nr: 1638154.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $2,679.00
Current Penalty: $1,300.00
Issuance Date: 02/13/2023
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0111700
Contest Date:
Final Order: 04/05/2023
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/05/2023 | $1,300.00 | Serious | ||
| Penalty | Z: Issued | 02/13/2023 | $2,679.00 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, form or scrap lumber with protruding nails was not kept clear from work areas: Site- Employees were not protected from trip and puncture hazards where lumber with protruding nails was picked up off of the ground and building floors.
Translate