Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1632283.015
Citation: 01003D
Citation Type: Serious
Abatement Date: 11/15/2022 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 11/07/2022
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0936400
Contest Date:
Final Order: 12/12/2022
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/12/2022 | $0.00 | 11/15/2022 | Serious | |
| Penalty | Z: Issued | 11/07/2022 | $0.00 | 11/15/2022 | Serious |
Text For Citation: 01 Item/Group: 003D Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and/or cables were run through holes in walls, ceilings, or floors: a) MAINTENANCE SHOP: A receptacle box mounted to the wall of the Conex box was powered by a flexible cord with plug attachments that was ran through a hole in the wall, exposing employees to shock hazards.