Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1630537.015
Citation: 01006B
Citation Type: Serious
Abatement Date: 12/28/2022 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/08/2022
Nr Instances: 1
Nr Exposed: 11
Related Event Code (REC):
Gravity: 1
Report ID: 0936300
Contest Date:
Final Order: 01/09/2023
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/09/2023 | $0.00 | 12/28/2022 | Serious | |
| Penalty | Z: Issued | 12/08/2022 | $0.00 | 12/28/2022 | Serious |
Text For Citation: 01 Item/Group: 006B Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: Outside the office window: Multiple extension cords were secured to the wall and ceiling providing power to the overhead light and Charge it! battery charger. Employees were exposed to electrical and fire hazards.