Violation Detail
Standard Cited: 19100219 E01 I Mechanical power-transmission apparatus.
Inspection Nr: 1625354.015
Citation: 01002B
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/27/2023
Nr Instances: 1
Nr Exposed: 12
Related Event Code (REC):
Gravity: 5
Report ID: 0418600
Contest Date: 04/19/2023
Final Order: 03/29/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 03/29/2024 | $0.00 | Serious | ||
Penalty | C: Contested | 04/21/2023 | $0.00 | Serious | ||
Penalty | Z: Issued | 03/27/2023 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 002B Hazard:
29 CFR 1910.219(e)(1)(i):Horizontal belts which had both runs seven feet or less from the floor level were not guarded with a guard that extended to at least fifteen inches above the belt: a) Production Floor, Sig Pack Transerver; On or about September 28, 2022, and at times prior to, the employer allowed employees to work around a Pemco Ream Wrapper machine with an unguarded belt, exposing employees to crush-by and amputation hazards.