Violation Detail
Standard Cited: 19260454 B Training requirements.
Inspection Nr: 1623528.015
Citation: 01006
Citation Type: Serious
Abatement Date: 03/27/2023 2
Initial Penalty: $4,688.00
Current Penalty: $3,700.00
Issuance Date: 03/15/2023
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0215000
Contest Date:
Final Order: 04/04/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/04/2023 | $3,700.00 | 03/27/2023 | Serious | |
Penalty | Z: Issued | 03/15/2023 | $4,688.00 | 03/27/2023 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.454(b): The employer did not have each employee who was involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the work. Location: a) Supported scaffold on the north side of the building: On or about September 20, 2022, employees installed a winch hoist, for material hoisting, on the top tier platform of the scaffold. Subsequently, the employees removed two planks from the scaffold platform underneath the hoist, to provide an opening to hoist material. The employees that installed the hoist and removed the planks were not trained in scaffold erection, moving, dismantling or alteration.