Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1623385.015
Citation: 01002
Citation Type: Serious
Abatement Date: 04/12/2023 2
Initial Penalty: $15,469.00
Current Penalty: $15,469.00
Issuance Date: 03/17/2023
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 03/30/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/30/2023 | $15,469.00 | 04/12/2023 | Serious | |
Penalty | Z: Issued | 03/17/2023 | $15,469.00 | 04/12/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(d)(3):All energy isolating devices that were needed to control the energy to the machine or equipment were not physically located and operated in such a manner as to isolate the machine or equipment from the energy source(s): a) For the Rayco production area, on or about September 19, 2022, and at times prior to, the employer exposed employees to caught-in hazards, in that, cycle pause buttons and emergency stop buttons and devices were used to de-energize the nailing gantry component of the Rayco pallet assembly machine, model Pallet Pro, Serial # P201849, for pallet jam clearing. b) For the Rayco production area, on or about September 19, 2022 and at times prior to, the employer exposed employees to caught-in hazards, in that, cycle pause buttons and emergency stop buttons and devices were used to de-energize the nailing gantry component of the Rayco pallet assembly machine, model Pallet Pro, Serial # Serial # P201957-0PP, for pallet jam clearing.