Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1620681.015
Citation: 01002
Citation Type: Serious
Abatement Date: 01/09/2023 2
Initial Penalty: $5,801.00
Current Penalty: $5,000.00
Issuance Date: 12/08/2022
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 01/24/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/24/2023 | $5,000.00 | 01/09/2023 | Serious | |
Penalty | Z: Issued | 12/08/2022 | $5,801.00 | 01/09/2023 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii)(B):The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. On or about September 8, 2022, employees engaged in pumpjack repair were exposed to caught-in hazards as the employer failed to ensure the use of specific energy control procedures.