Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1619284.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/07/2023 2
Initial Penalty: $4,465.00
Current Penalty: $3,126.00
Issuance Date: 02/22/2023
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0524530
Contest Date:
Final Order: 03/16/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/16/2023 | $3,126.00 | 04/07/2023 | Serious | |
Penalty | Z: Issued | 02/22/2023 | $4,465.00 | 03/20/2023 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): Century Casting Corporation located at 1300 North Illinois Street in Belleville, IL 62220: On or about 2 September 2022, the Roberts Sinto Corporation FBO-II Molding Machine - serial number FMM-0106-00 Lockout Procedure No.: CCC-0006, did not contain the necessary specificity to clearly outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance. The procedure contained generic language that did not provide the necessary detailed information such as: specific procedural steps for shutting down, isolating the energy sources (hydraulic, pneumatic, electrical, gas, and secondary electrical), blocking and securing the machine; specific procedural steps for the placement of lockout devices; and the specific actions to perform for verification of the effectiveness of the lockout implementation and other energy control measures.