Violation Detail
Standard Cited: 19260652 A01 Requirements for protective systems.
Inspection Nr: 1607384.015
Citation: 02002
Citation Type: Other
Abatement Date: 01/20/2023 2
Initial Penalty: $72,514.00
Current Penalty: $3,770.65
Issuance Date: 01/09/2023
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): I
Gravity: 10
Report ID: 0830500
Contest Date: 02/01/2023
Final Order: 07/27/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/27/2023 | $3,770.65 | 01/20/2023 | Other | |
Penalty | C: Contested | 02/04/2023 | $72,514.00 | 01/20/2023 | Willful | |
Penalty | Z: Issued | 01/09/2023 | $72,514.00 | 01/20/2023 | Willful |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1926.652(a)(1): Each employee in an excavation was not protected from cave-ins by an adequate protective system designed in accordance with 29 CFR 1926.652 (b) or (c). (a) Breakthrough Resource Management, 8355 E 32nd Ave., Denver, CO 80238; Solana at Central Park Project: On or about July 12, 2022, and at time prior employees were conducting plumbing work, such as laying pipe in a trench 16 feet deep without protective systems in place. This exposed the employees to cave-in hazards.