Violation Detail
Standard Cited: 19260417 B Lockout and tagging of circuits.
Inspection Nr: 1606818.015
Citation: 01003
Citation Type: Serious
Abatement Date: 01/17/2023 2
Initial Penalty: $4,351.00
Current Penalty: $3,000.00
Issuance Date: 01/03/2023
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 02/27/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/27/2023 | $3,000.00 | 01/17/2023 | Serious | |
Penalty | Z: Issued | 01/03/2023 | $4,351.00 | 01/17/2023 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.417(b): Equipment or circuits that were de-energized were not rendered inoperative: On or about July 7, 2022, at Harbor Freight Tools located at 2021 E. Madison St, Bastrop, LA; employees installed light fixtures with the circuits energized and not tagged. This exposed the employee to an electrocution hazard.