Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1602901.015
Citation: 01006
Citation Type: Serious
Abatement Date: 12/30/2022
Initial Penalty: $9,324.00
Current Penalty: $9,324.00
Issuance Date: 12/12/2022
Nr Instances: 1
Nr Exposed: 20
Related Event Code (REC):
Gravity: 5
Report ID: 0213100
Contest Date: 01/10/2023
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 01/10/2023 | $9,324.00 | 12/30/2022 | Serious | |
Penalty | Z: Issued | 12/12/2022 | $9,324.00 | 12/30/2022 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: (a) At the worksite (White Lake Facility): On or about 6/19/22, the employer did not conduct an annual or more frequent inspection of the energy control procedure(s) for machines such as but not limited to, refrigerated coolers and chiller unit(s).