Violation Detail
Standard Cited: 19260451 G04 I General requirements.
Inspection Nr: 1597171.015
Citation: 01003B
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/15/2022
Nr Instances: 3
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0626600
Contest Date:
Final Order: 09/16/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/16/2022 | $0.00 | Serious | ||
Penalty | Z: Issued | 08/15/2022 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 003B Hazard:
29 CFR 1926.451(g)(4)(i):Guardrail systems shall be installed along all open sides and ends of platforms. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews. On or about May 19, 2022, employees were conducting masonry activities from a tubular welded frame scaffold more than 10 feet above a lower level without a guardrail system installed on all open sides and ends of platforms to protect employees from falls.