Violation Detail
Standard Cited: 19100219 I02 Mechanical power-transmission apparatus.
Inspection Nr: 1593763.015
Citation: 01006
Citation Type: Serious
Abatement Date: 11/07/2022 2
Initial Penalty: $10,256.00
Current Penalty: $10,256.00
Issuance Date: 10/27/2022
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC):
Gravity: 5
Report ID: 0524700
Contest Date: 11/16/2022
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 11/28/2022 | $10,256.00 | 11/07/2022 | Serious | |
Penalty | Z: Issued | 10/27/2022 | $10,256.00 | 11/07/2022 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1910.219(i)(2): Bolt(s), nuts, or setscrews used in shaft coupling(s) extended beyond the flange of the coupling and were not covered with safety sleeve(s): a. NOX US, LLC - Fostoria, Ohio: On or about May 4, 2022, the employer did not ensure that the couplings, located at the rotary joints on the end of the rolls on Mix Mill #2, were guarded to protect employees from being caught in the protruding bolts/rotating parts. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.