Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1590227.015
Citation: 01001
Citation Type: Serious
Abatement Date: 02/28/2023 2
Initial Penalty: $10,360.00
Current Penalty: $10,360.00
Issuance Date: 09/02/2022
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0317700
Contest Date:
Final Order: 09/22/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | 10/26/2022 | $10,360.00 | 02/28/2023 | Serious | |
Penalty | I: Informal Settlement | 09/22/2022 | $10,360.00 | 10/28/2022 | Serious | |
Penalty | Z: Issued | 09/02/2022 | $10,360.00 | 09/29/2022 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle: a) Fabrication Shop: The point of operation on the Edwards Pearson 20-ton hydraulic press brake was not guarded to prevent the operator from having their hand in the danger zone during the operating cycle, on or about May 10, 2022. b) Fabrication Shop: The point of operation on the Clausing Megobal hydraulic press brake was not guarded to prevent the operator from having their hand in the danger zone during the operating cycle, on or about May 10, 2022. ABATEMENT CERTIFICATION REQUIRED