Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1569530.015
Citation: 01001B
Citation Type: Serious
Abatement Date: 06/01/2022 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/14/2022
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 10
Report ID: 0112600
Contest Date:
Final Order: 05/11/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 04/14/2022 | $0.00 | 06/01/2022 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.147(c)(6)(i):The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: 138 Palmer Ave, West Springfield, MA: On December 20, 2021 and for many months prior, the employer had not performed a comprehensive periodic inspection of the energy control procedures including, but not limited to the sort line conveyor machine, at least annually, to verify that the procedures were adequate and being used properly by employees. Abatement Note: A periodic inspection shall include the following elements: - Appointment of an authorized employee to inspect each procedure for inaccuracies during an actual energy control task - A review by inspector with each authorized employee, of that employee's responsibilities under each energy control procedure they are authorized to use - Certification that the periodic inspections have been performed by identifying the machines or equipment on which the energy control procedures were being utilized, the dates of the inspections, the employees included in the inspections, and the persons performing the inspections