Violation Detail
Standard Cited: 19260850 J Preparatory operations.
Inspection Nr: 1568566.015
Citation: 01006
Citation Type: Serious
Abatement Date: 06/27/2022 2
Initial Penalty: $14,502.00
Current Penalty: $14,502.00
Issuance Date: 05/31/2022
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): A
Gravity: 10
Report ID: 0419700
Contest Date: 06/28/2022
Final Order: 06/08/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 06/08/2023 | $14,502.00 | 06/27/2022 | Serious | |
Penalty | C: Contested | 06/30/2022 | $14,502.00 | 06/27/2022 | Serious | |
Penalty | Z: Issued | 05/31/2022 | $14,502.00 | 06/27/2022 | Serious |
Text For Citation: 01 Item/Group: 006 Hazard:
29 CFR 1926.850(j): The demolition did not begin at the top of the structure and proceed downward before the removal of exterior wall and floor construction below: a. 3359 Penny Lane, in Middleburg Florida, in the backyard: On or about December 13, 2021, and at times prior, the employer did not start at the top to dismantle wall structures, exposing employees to collapse and crushing hazards.