Violation Detail
Standard Cited: 19100303 B08 I General.
Inspection Nr: 1568101.015
Citation: 01001B
Citation Type: Other
Abatement Date: 05/31/2022 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/04/2022
Nr Instances: 2
Nr Exposed: 80
Related Event Code (REC): A
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 05/31/2022
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/31/2022 | $0.00 | 05/31/2022 | Other | |
| Penalty | Z: Issued | 05/04/2022 | $0.00 | 05/31/2022 | Serious |
Text For Citation: 01 Item/Group: 001B Hazard:
29 CFR 1910.303(b)(8)(i): Electrical equipment was not firmly secured to the surface on which it was mounted: a) Warehouse Column 1, Mounted Outlet (20A/120V) - The metal conduit was not secured to the column in at least two (2) locations, on or about December 2, 2021 and times prior thereto. b) Warehouse Column 2, Mounted Outlet (20A/120V) - The metal conduit was not secured to the column in at least one (1) location, on or about December 2, 2021 and times prior thereto. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.