Violation Detail
Standard Cited: 19100303 B01 II General.
Inspection Nr: 1568101.015
Citation: 01001A
Citation Type: Other
Abatement Date: 05/31/2022 2
Initial Penalty: $13,052.00
Current Penalty: $13,052.00
Issuance Date: 05/04/2022
Nr Instances: 2
Nr Exposed: 80
Related Event Code (REC): A
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 05/31/2022
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/31/2022 | $13,052.00 | 05/31/2022 | Other | |
| Penalty | Z: Issued | 05/04/2022 | $13,052.00 | 05/31/2022 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.303(b)(1)(ii): Electrical equipment was not free from recognized hazards, based on the mechanical strength and durability, including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus provided: a) Warehouse Column 1, Mounted Outlet (20A/120V) - The metal conduit, faceplate (cover), and outlet box were not sufficiently durable for their location, or about December 2, 2021 and times prior thereto. b) Warehouse Column 2, Mounted Outlet (20A/120V) - The metal conduit, faceplate (cover), and outlet box were not sufficiently durable for their location, on or about December 2, 2021 and times prior thereto. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.